Solution: Plant Safety: Bow-Tie

Solution: Plant Safety: Bow-Tie

Dipl.-Ing. Dr. Martin Doktor

Dipl.-Ing. Dr. Martin Doktor

Deutschstraße 10 1230 Wien Österreich

+43 5 0454 6137

E-posta gönder

Dipl.-Ing. Dr. Martin Doktor
TÜV AUSTRIA Vertrieb

TÜV AUSTRIA Vertrieb

Deutschstraße 10 1230 Wien

TÜV AUSTRIA Vertrieb
TÜV AUSTRIA GMBH

TÜV AUSTRIA GMBH

Region: Österreich

Deutschstraße 10 1230 Wien Österreich

+43 5 0454 0

E-posta gönder

TÜV AUSTRIA GMBH

Bow-TieBow-Tieangle down red

Bu çözüme hangi bölgede ihtiyacınız var?Bu çözüme hangi bölgede ihtiyacınız var?angle down red

"A qualitative risk assessment method resulting in a that combines cause and hazard (fault tree) with the consequence steps (event tree)."

Bow-Tie Analysis is a structured, qualitative method for risk assessment. The result is a diagram that combines both the chain of cause and hazard (fault tree) as well as the chain of consequence steps (event tree). The fault tree on the left and the event tree on the right are connected by the associated top event (such as a product release) in the middle.

Ein Bow-Tie-Diagramm soll, wenn möglich, für alle Major-Accident-Hazards (MAH) erstellt werden, welche gegebenenfalls in einer Gefahren- und Risikoanalyse zu identifizieren sind.

The Bow-Tie diagram provides a snapshot of the cause/hazard and consequences of the main scenarios as well as control elements at the time of analysis. It also provides a snapshot of the barriers used to prevent the occurrence of the adverse event or to limit its impact. Once the examination is complete, the situation may change, for example because control measures have taken effect.

Bow-Tie diagrams are created by depicting following building blocks:

  • Hazard (example: presence of hydrocarbons)
  • Top event due to hazard (example: product release)
  • Causes that enable the occurrence of a top event
  • Consequences due to the occurrence of a top event
  • Barriers which are intended to prevent the occurrence of the top event on the causal side (preventive control barriers)
  • Barriers intended to reduce the extent of damage once a top event has occurred (mitigative barriers)

A Bow-Tie diagram should be prepared, if possible, for all Major Accident Hazards (MAHs) which are to be identified in a hazard and risk analysis if necessary.

close

"*" gerekli alanları gösterir

Land*
Address
Bu alan doğrulama amaçlıdır ve değişiklik yapılmadan bırakılmalıdır.

Ben tami.

close

Buraya ilk kez mi geliyorsunuz? Yolunuzu bulmanıza yardımcı olmaktan mutluluk duyacağım.

Sertifikayı kontrol edin

arrow right red

Bir çözüm bulun

arrow right red

Bilim ödülü gönderin

arrow right red

arrow leftSertifikayı kontrol edin

close
  • Kişi Sertifikası

  • Ürün Sertifikası

  • Sistem Sertifikası

  • Uygunluk Doğrulaması

Verileri girin ve bir sertifikayı kontrol edin

arrow leftBir çözüm bulun

close

Size nasıl yardımcı olabilirim?

arrow leftWiPreis einreichen

close

arrow left

close

arrow leftWiPreis gönder

close

"*" gerekli alanları gösterir

1
2
3
4
First, please select in which category you would like to submit*

You cannot copy content of this page